LAST STAGE OF DEVELOPMENT FOR LAKESIDE GOLF COURSE AT DA STAGE

In conjunction with Enspire Engineering Consultancy, GBD is finalizing detail drawings for hole 13 to 17 as part of the last stage of works to implement the master plan of the reconfigured Lakeside Golf Course at Camden.